Show menu Search
Mass Media
Ministry of Industry and Infrastructural Development of the Republic of Kazakhstan

You are here

Division of monitoring and control of rational and integrated subsoil management

OBJECTIVES
The main objectives of the Division within the competence of the Committee are:
1) to provide monitoring and control of the rational and integrated subsoil use in the Republic of Kazakhstan;
2) to coordinate the Committee’s structural units activities pertaining to provide monitoring and control of the rational and integrated subsoil use in the Republic of Kazakhstan;
3) to provide explanation of the applicable legislation of the Republic of Kazakhstan in the field of the rational and integrated subsoil use;
4) to improve legislation and regulatory acts in the field of the rational and integrated subsoil use.
RESPONSIBILITIES
In accordance with the objectives entrusted and procedures established the Division has the following responsibilities:
1) to perform monitoring of the fulfilment of contract conditions on survey, production, joint survey and production of the solid minerals, underground water deposits and therapeutic mud;
2) to perform control of the rational and integrated subsoil use, including primary processing (separation) of the minerals, except hydrocarbon crude;
3) to perform control of the fulfilment of conditions stipulated by contracts for subsoil users (agreements) on the State geological research of subsoil recourses in the field of solid mineral resources, underground water deposits and therapeutic mud;
4) to approve an order of conduct of operations in the field of subsoil use for the solid natural recourses, underground water deposits and therapeutic mud within a single license area;
5) to approve a consolidated working program for the whole production field of solid mineral resources, underground water deposits and therapeutic muds when concluding the agreement on joint survey or production;
6) to participate in authorised commissioning of closing and abandonment works on solid mineral object of the subsoil use, underground water deposits and therapeutic mud;
7) to approve the use of an abandonment fund under the contracts on solid mineral resources, underground water deposits and therapeutic mud;
8) to approve draft contracts and amendments to them, as well as the working programs under the contracts in the field of solid mineral resources, underground water deposits and therapeutic mud;
9) to approve project documents on production in terms of the rational and integrated subsoil use on solid mineral resources, Underground water deposits and therapeutic mud;
10) to approve project documents on solid mineral resources, underground water deposits and therapeutic mud in accordance with there commendations of the Central Committee on Survey and Production of the Minerals;
11) to extend the term of the project documents on performance of production works with approval of the Central Committee, depending on the capacity of the approved deposits of the minerals in the field of solid mineral resources, underground water deposits and therapeutic mud;
12) to control the compliance of the subsoil users with the Law of the Republic of Kazakhstan «On subsoil and subsoil use» and with the established order of the subsoil use with regard to widespread minerals;
13) in cooperation with subsoil users to define the damage caused by the violation of requirements in the field of the rational subsoil use in the process of production of the solid mineral resources;
14) to issue conclusions on absence or presence of the minerals depositsin the areas where construction sites are being planned;
15) to provide analysis of the quarterly and annual reports on the rational and integrated subsoil, presented by the regional departments;
16) to prepare monthly and annual reports according to the departmental statistical accountability on the issues of control of the private enterprises working in the field of subsoil study and use;
17) to develop regulatory and technical documents in the field of the rational and integrated subsoil.
2012, 1 -9 months Information Summary for on the results of control activities of the Committee of Geology and Subsoil Use
In 2012 within 9 months the Committee of Geology and Subsoil Use completed the following work regarding the control activity of the rational and integrated subsoil use.
The Committee has conducted 714 inspections of subsoil users, 596 of them were arranged and 118 were unscheduled (upon an initiative of other state authorities). Within the inspection the Committee detected 893 violations, issued 775 orders, fined legal and private persons up to 88338.176 thousand tenge.
The Committee considered and issued conclusions for 335 project documents for survey and production.
The authority also considered and issued conclusions for 93 draft Contracts and Amendments to the Contracts.
 
© 2019

Ministry of Industry and Infrastructural Development of the Republic of Kazakhstan

Committee of Geology and Subsoil Use